17th November 2013

Sunday Work

I spent some time working on firewall fire&sound insulation plans, and slightly modifying plans for wiring pass thru holes. In addition, to the 2 holes (L&R) already cut, I’m planning a third hole at the far left side of the firewall (below the Slickstart) for the magneto wires. I’m going to route them separately & as far as I can get them from anything audio or digital. The shield of the magneto wires will also be grounded when they go through the firewall.

Also switched to steel fittings everywhere and ordered some 3M Fire Barrier silicone sealant to use on the firewall. Put the one-hole eyeballs up for sale.

WiringRoutes_01(1)[1]

Hours: 2.0 | Posted in Bulkheads, Foward Fuselage | 0 Comments