Tail Cone

TO-DO LIST

REQUIRED TO FLY: (Tag: Required)

  1. Cover plate for old belly strobe
  2. Cover plate or new antenna in VOR position
  3. Finish static air ports & plumbing
  4. Install magnetometer
  5. servo system for elevator trim

NICE TO HAVE: (Tag: Nice)

  1. Install Pitch servo

AS TIME PERMITS: (Tag: Future)

Posted in Tail Cone | 0 Comments

12th October 2013

Work Catch Up Post

Even though I haven’t been able to post to the server I have been working. These photos will later be annotated to describe work done.

20131010_163406 20130911_144633 20130921_132127 20130921_132147 20130925_154924 20130925_154942 20130925_155005 20130927_111816 20131001_142644 20131001_142654 20131005_154415 20131005_154418 20131007_114043 20131009_123435 20131010_163349 20131010_163349[1] WiringRoutes_01 20131010_163406[1] Challenge 20130619_120302 20130619_122140 20130619_122123 20130619_120302 20130619_120235 20130530_160122 20130530_160148 20130529_140952[1]

Hours: 40 | Posted in Avionics, Bulkheads, Center Section, Electrical, Foward Fuselage, Instruments, Interior, Miscellaneous, Tail Cone | 0 Comments