14th November 2013

More firewall

Trying to finish up firewall:

Grounding block, firewall forward

20131114_161347[1]

 

Grounding block, firewall aft.

20131114_161357[1]

 

I decided to have a backing plate and nutplates for the RDAC-XF. The layout has holes for AN3 mounting bolts into nutplates (4) and a number of rivet holes for attaching the backing plate. Fabricated the backing plate.

20131114_161408[1]

 

And primed the backing plate for attachment tomorrow.

20131114_161428[1]

Hours: 4.0 | Posted in Uncategorized | 0 Comments

10th October 2013

test post after fixing server

Test post

WiringRoutes_01

Posted in Uncategorized | 0 Comments

19th July 2013

Challenge

Posted in Uncategorized | 0 Comments